Skip to main content

Cowi, BCC team up for Florida bridge deal

Cowi will be a subconsultant to BCC Engineering under the five-year district-wide contract with the Florida Department of Transportation in the US.
By David Arminas May 10, 2024 Read time: 1 min
Cowi will be a key bridge player in Florida (© Frolandr/Dreamstime)

Cowi, along with BCC Engineering, has been selected to serve on a five-year continuing services contract to provide engineering services for in-service bridges in Florida.

Cowi, a global Danish engineering design consultancy, will serve as a subconsultant to BCC Engineering under the five-year district-wide contract. The deal with the Florida Department of Transportation builds on their previous successful collaboration on District 6 projects.

BCC, established in the southern Floridian city of Miami in 1994, employs 335 people and has delivered over US$6 billion in over 100 design and maintenance contracts.

In April 2022, Cowi announced it was acquiring Finley Engineering Group, a specialty engineering firm focused on complex bridge projects. At the time, Cowi said the acquisition was part of its focus on growing its presence in North America following recent opening of its offices in Houston, Texas, and in Toronto, Canada.

Finley is based in Tallahassee, Florida, and has a satellite office in Prague, Czech Republic. It employs 35 specialists within bridge design and construction engineering services, and has worked on more than 100 projects in the US, Canada, Middle East, Africa and South America.

For more information on companies in this article

Related Content

  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • Caterpillar further develops operations in Africa and Middle East
    December 21, 2012
    Caterpillar has revealed details of its “significant” investment in new and upgraded parts distribution centres in Africa and the Middle East (AME). The investment, highlighted during Cat’s recent Construction Days event in Antalya, Turkey, is in addition to the US$460 million invested by the company’s AME dealers in 2011 to improve local operations, reports Guy Woodford. “We are going to open in March [2013] a complete new parts distribution centre in Dubai, which is significant,” said Christian Dillier, A
  • Brazil-Paraguay bridge project
    March 19, 2025
    Progress for Brazil-Paraguay bridge project
  • Bridge milestones for Transylvania in Romania
    July 21, 2025
    The Transylvania Bridge - Romania’s longest cable-stayed bridge - and the Buzău River Bridge - the country’s longest bridge - were recently completed.