Skip to main content

Costly bridge link

Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.
May 30, 2012 Read time: 1 min
Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now  expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.

Related Content

  • Texan tolling
    February 7, 2012
    Work is now underway on the new DFW Connector near Dallas, in the US state of Texas. This is of note as it is the largest investment of Recovery Act (ARRA) investment in a highway project so far.
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around