Skip to main content

Costly bridge link

Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.
May 30, 2012 Read time: 1 min
Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now  expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.

Related Content

  • Increasing climate change resilience through effective maintenance
    January 30, 2020
    IRF spoke to Valerio Molinari from Ecogest SpA about maintenance as an effective means for increasing infrastructure resilience.
  • Colombia’s key road transport projects
    May 10, 2019
    A series of major road transport projects are moving ahead in Colombia, with the country’s national infrastructure agency (ANI), handling most of the deals. In the country’s capital, Bogota, design work is now complete on the Calle 13 and Accesos Norte II road projects. The Calle 13 project will see an 11.5km section of route widened so that it features three lanes in either direction. The work will also include building new facilities for pedestrians and cyclists. This project is expected to cost US$1.15 b
  • Europe calls for new road safety target
    September 9, 2015
    The European Parliament has reiterated calls for a pan-European target to cut serious road injuries. In a vote on a review of European transport policy since 2011, MEPs called for, “the swift adoption of a 2020 target of a 40 % reduction in the number of people seriously injured, accompanied by a fully-fledged EU strategy.” Since 2010 the number of people seriously injured on EU roads has been reduced by just 1.6%, compared to an 18% decrease in the number of road deaths. Last year the numbers actually
  • Tenders soon to replace Beaumont Bridge
    May 4, 2021
    The Waka Kotahi, NZ Transport Agency, said construction over the Clutha River is expected to take two years and cost around US$14.5 million.