Skip to main content

Cortec introduces environmentally friendly MCI coating for rebar

Cortec's MCI (Migratory Corrosion Inhibitor) coating for rebar is a water-based product that provides corrosion protection in outside storage as well as offering powerful corrosion resistance for embedded rebars. As a soft film, MCI is suitable for long-term indoor protection of up to five years as well as short- to medium-term, from six to 24 months, unsheltered outdoor protection. Cortec’s patented MCI technology rehabilitates existing concrete structures as well as extending the life of new structures.
July 7, 2016 Read time: 2 mins
Cortec's MCI (Migratory Corrosion Inhibitor) coating for rebar is a water-based product that provides corrosion protection in outside storage as well as offering powerful corrosion resistance for embedded rebars. As a soft film, MCI is suitable for long-term indoor protection of up to five years as well as short- to medium-term, from six to 24 months, unsheltered outdoor protection. Cortec’s patented MCI technology rehabilitates existing concrete structures as well as extending the life of new structures.

Cortec MCI products for concrete maintain structural integrity, rehabilitate vulnerable structures and alleviate environmental concerns. Cortec says that a unique feature of MCI is that the inhibitor will migrate a considerable distance through concrete to protect embedded ferrous metals.

MCI coating for rebar protects steel, aluminium, cast iron and tin and does not affect concrete adhesion to rebar. This safe-to-use inhibitor cures to a soft film and eventually hardens.

The recommended dry film thickness range is 25-50 microns (1-2 mils). It can be removed by using an alkaline cleaner such as MCI-2060 if needed the coating works well in SO2 and H2S environment.

MCI coating for rebar can be used as is or be diluted with water up to 50%, as long as a 25-50 microns (1.0-2.0 mils) dry film thickness is reached on the surface to be protected. It can be applied by spray, brush, roll or dip.

Related Content

  • Kögel develops trailer insulation package
    January 18, 2016
    German firm Kögel says it can ensure high quality is maintained for asphalt deliveries with its new insulation system. This allows asphalt temperatures to be maintained even during longer trips between an asphalt plant and a job site where the material is to be used. The package is available as a retrofit option while the firm also offers new trailers with the system installed. The firm says that two- and three-axle tipper trailers with volumes of 24m³ can now be provided with all the available wall and
  • Haver & Boecker’s mixed screen media options boosts efficiency
    November 7, 2018
    Haver & Boecker recently showcased at the AGG1 2018 exhibition in Houston, US, its blended screen media options for each vibrating screen deck. The Canadian aggregates equipment manufacturer says that the blended screen media approach offers improved efficiency by extending screen media life and minimising issues such as blinding and pegging. The company’s technicians work with producers, evaluating their applications, challenges and goals to customise screen media selection. Before making recommendations
  • When the rain comes
    July 18, 2012
    Statistics show that wet weather and the dark is not the best mix for driving, but road markings offer a safety solution While good road markings are essential any time of the day, it is perhaps at night when roads are wet that they can offer extra guidance. Statistics are said to reveal that an estimated 50% of all accidents happen during the night when it rains but such conditions occur only 10% of the time and when there are usually less vehicles on the road. Indeed, at the 1st Road Marking Symposium hel
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.