Skip to main content

Controversial £2 billion Stonehenge bypass project halted

The UK's controversial £2 billion Stonehenge bypass project has been halted, prompting relief amongst environmentalists and historians who opposed the construction work.
By MJ Woof July 30, 2024 Read time: 2 mins
The Stonehenge Bypass project in the UK has been halted – image courtesy of © Hiroshi Tateishi| Dreamstime.com

The UK’s new Labour Government is halting the controversial £2 billion project to build a bypass road and tunnel link around Stonehenge. The 3.2km dual carriageway bypass has been the subject of numerous legal challenges on both archaeological and environmental grounds but the plans had been approved by the previous Conservative Government.  

The busy A303 features just a single lane in either direction as it passes the famous ancient Stonehenge monument, suffering heavy congestion as the route is a dual carriageway for the rest of its length. There have been plans to build a dual tube tunnel at a distance from the monument for more than two decades. These have been cancelled on previous occasions also, largely due to concerns over cost rather than environmental or archaeological concerns.  

National Highways says that building a tunnel to carry the A303 would cut congestion and also boost safety but environmentalists and archaeologists have united to oppose the plan, launching a series of legal challenges to the project. They claim the bypass would cause environmental harm and also risk damaging important historical areas.  

Building the tunnel would have been complex, boosting the cost of the work. The geology of the area features poor quality rock that is heavily fragmented as well as a high water table. The tunnel would have needed extensive support measures as well as waterproofing to keep it strong and dry. Meanwhile, complex water control and separation methods would have been required to ensure that the water table would have been undisturbed and that no contaminants would reach the local water courses. 

This time it seems as if the project has been cancelled largely on economic grounds (once again). The new Labour Government has said that there are insufficient funds for the project to go ahead, with other national priorities such as health and education to be addressed first given the disastrous financial mismanagement of the previous administration. 

With concerns growing over stability in Europe, the need for the bypass may become more pressing however, given the importance of the route for the UK military for transporting heavy equipment from the many bases along the route.

For more information on companies in this article

Related Content

  • Stonehenge tunnel project being designed
    April 12, 2017
    Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T
  • £8 billion UK tunnel project to go ahead
    January 30, 2025
    The £8 billion UK Lower Thames Crossing tunnel project is to go ahead.
  • Italy's Messina Strait bridge
    March 20, 2023
    The Messina Strait Bridge project in Italy is being revived.
  • New Zealand highway proposed
    June 15, 2021
    A potentially controversial tolled highway project has been proposed for New Zealand's South Island.