Skip to main content

Contracts for $1.9 billion Francis Scott Key bridge

Key contracts have been awarded for the $1.9 billion Francis Scott Key bridge.
By MJ Woof February 27, 2025 Read time: 2 mins
Construction work is commencing for the new Francis Scott Key Bridge replacement project

 

Contracts have been awarded for the Francis Scott Key Bridge replacement project by the Maryland Transportation Authority (MTDA). The new cable-stayed bridge will cost up to $1.9 billion and measure around 3.2km in total, providing a safer crossing for drivers than the earlier bridge spanning the Patapsco River.

A joint venture comprising STV and Michael Baker International will provide construction management and inspection services to Kiewit and Bridging Maryland Partnership, which is a joint venture of RK&K, JMT and WSP for the design-build project.

The construction management and inspection services consultants will carry out duties such as inspections of construction, constructability reviews, scheduling and materials testing.

The new bridge will follow the same alignment as the collapsed structure and will feature a cable stayed design. However, it will feature significantly improved safety with protection for its supports to prevent damage in the event of an impact by a large vessel. The central span will be wider at 305m instead of the 213.4m of the collapsed bridge. It will also have a 70m clearance instead of 56m previously.

Demolition work for the remaining portions of the old bridge still standing will commence shortly. The collapsed sections were removed by Skanska last year, clearing the waterway for shipping traffic into and out from the Port of Baltimore.

 

 

 

Related Content

  • UK’s A14 upgraded route opening early
    October 14, 2019
    A key section of the UK’s important A14 upgrade project is opening to traffic ahead of schedule. Work to deliver the new stretch of dual carriageway for the A14 bypass is being completed a full 12 months early. The bypass section will open to drivers in December 2019, cutting congestion and journey times. Work on the 19km bypass section commenced in October 2016 and forms part of a programme of 33.6km of road works in Cambridgeshire, costing £1.5 billion. The road building project has been carried out by
  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • Doubts over a Helsingør-Helsingborg link
    April 14, 2021
    Danish minister questions feasibility of a road-rail tunnel between the Danish and Swedish cities.
  • Trail blazing for the Gordie Howe Bridge
    February 23, 2024
    Gordie Howe International Bridge between Canada and the US will become the first international bridge to link national trail systems across the border.