Skip to main content

Contracts for $1.9 billion Francis Scott Key bridge

Key contracts have been awarded for the $1.9 billion Francis Scott Key bridge.
By MJ Woof February 27, 2025 Read time: 2 mins
Construction work is commencing for the new Francis Scott Key Bridge replacement project

 

Contracts have been awarded for the Francis Scott Key Bridge replacement project by the Maryland Transportation Authority (MTDA). The new cable-stayed bridge will cost up to $1.9 billion and measure around 3.2km in total, providing a safer crossing for drivers than the earlier bridge spanning the Patapsco River.

A joint venture comprising STV and Michael Baker International will provide construction management and inspection services to Kiewit and Bridging Maryland Partnership, which is a joint venture of RK&K, JMT and WSP for the design-build project.

The construction management and inspection services consultants will carry out duties such as inspections of construction, constructability reviews, scheduling and materials testing.

The new bridge will follow the same alignment as the collapsed structure and will feature a cable stayed design. However, it will feature significantly improved safety with protection for its supports to prevent damage in the event of an impact by a large vessel. The central span will be wider at 305m instead of the 213.4m of the collapsed bridge. It will also have a 70m clearance instead of 56m previously.

Demolition work for the remaining portions of the old bridge still standing will commence shortly. The collapsed sections were removed by Skanska last year, clearing the waterway for shipping traffic into and out from the Port of Baltimore.

 

 

 

Related Content

  • Gordie Howe Bridge opening date set
    January 15, 2024
    The bridge connecting Detroit in the US state of Michigan and Windsor in the Canadian province of Ontaria will open in September next year.
  • Malaysia-Thailand bridge planned
    May 8, 2025
    A new bridge is planned to link Malaysia and Thailand.
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time
  • Parsons wins bridge deal in Arkansas
    January 17, 2017
    Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation