Skip to main content

Contract for Romanian highway construction signed

In Romania the road authorities have signed a deal for the construction of a 22km stretch of highway in a contract worth €91 million. The Portuguese contractor Monte Adriano will construct the section linking Nadlac with Pecica. Romania has pledged to improve and expand its highway network with the construction of new links, and much of the funding for its highway plans has been provided by the European Bank for Reconstruction and Development and the European Investment Bank (EIB).
May 10, 2012 Read time: 2 mins
In Romania the road authorities have signed a deal for the construction of a 22km stretch of highway in a contract worth €91 million.

The Portuguese contractor 2753 Monte Adriano will construct the section linking Nadlac with Pecica.

Romania has pledged to improve and expand its highway network with the construction of new links, and much of the funding for its highway plans has been provided by the 1166 European Bank for Reconstruction and Development and the 1054 European Investment Bank (EIB).

Meanwhile, the country’s new Basarab-Constanta highway stretch and the Constanta ring road will be partially open for traffic in July 2011. The highway project is being carried out by 1324 Astaldi and Max Boegl and is expected to cost €211 million.

Bidding is also healthy for other key road projects including modernisation of the DN18 national road linking Baia Mare with Iacobeni, a 200km project worth €194.65 million (excluding VAT) where bidders include Shapir of Israel; 945 Strabag of Austria; 1570 Aktor and Mochlos of Greece; and a consortium formed by Spedition UMB and Tehnostrade. Shapir, Aktor and Strabag placed bids to upgrade the stretch between Baia Mare and Sighetul Marmatiei and the section from Sighetul Marmatiei–Moisei. The three companies also placed bids for the upgrade of the third segment of the road between Moisei and Iacobeni.

Related Content

  • Astaldi wins contract for part of Romania’s Brasov–Oradea motorway
    April 19, 2016
    Italian contractor Astaldi, as part of a joint venture, has won a €100 million contract to build of motorway in Romania. The contract is 18km of the Brasov–Oradea section of the partially built A3 Autostrade, a 584km route that runs north to south, from the border with Hungary to the capital Bucharest. Astalsi’s design and construction work includes three viaducts, five overpasses, three flyovers, and one motorway interchange. Work will begin in May and last for 16 months. Work on the Brasov-Oradea
  • Slovakia’s troubled D1 highway
    February 20, 2012
    Slovakia’s Ministry of Transport is to finance construction work on the 75km section of D1 highway between Martin and Presov from state funds, with work expected to start in the second quarter of 2011.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Romanian contract for STRABAG
    June 9, 2020
    A new Romanian road contract has been won by STRABAG.