Skip to main content

Construction starts on Yichang section of China’s Yichang-Yueyang expressway

Construction works have begun on the Yichang section of China’s new Yichang-Yueyang expressway. Covering 51.8km, the Yichang expressway section will cost around US$613.35 million (CNY 3.82bn).
January 4, 2013 Read time: 1 min
Construction works have begun on the Yichang section of China’s new Yichang-Yueyang expressway. Covering 51.8km, the Yichang expressway section will cost around US$613.35 million (CNY 3.82bn).

Related Content

  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • UK traffic jams cost drivers £426mn in wasted fuel, report claims
    December 10, 2012
    Traffic jams in the UK are costing the country's 8.2 million drivers US$683.31 million (£426mn) a year in wasted fuel, according to an estimate in a report by the analytics firm Inrix. The cost, which equates to £52 a vehicle, is on top of an estimated wasted driver time cost of £2.7bn. Out of the traffic on the country's roads during the day Inrix states that 19% is freight, with business vehicles passing on £1.1 billion of costs every year to consumers in order to cover the cost of them waiting in traffic
  • Panama’s turnkey contracts worth US$4.51bn signed since 2009
    December 11, 2013
    Turnkey contracts, including major transport projects, worth US$4.51 billion (EUR 3.28bn) have been signed under the current government administration in Panama since its election in 2009, it has been reported. The value of the turnkey contracts signed during President Ricardo Martinelli’s time as head of state includes US$1.09 billion allocated to five contracts to widen a 185km road section between Santiago de Veraguas and David to four lanes. The most expensive contract, worth US$ 1.64 billion, is for a
  • Rijkswaterstaat starts A1 renovation
    January 23, 2019
    Renovation and widening of the A1 motorway in the Netherlands will start this month, according to the Dutch environment and infrastructure agency Rijkswaterstaat. The section covers 65km, between Apeldoorn and junction Azelo. Work is expected to take around 10 years and cost about €400 million. The A1 – 199km long - connects the capital city Amsterdam, near the interchange of Watergraafsmeer, with the German border near Oldenzaal and Bad Bentheim, and the German Autobahn BAB 30. On its way, it crosses