Skip to main content

Consortium for Italy's key highway project

The contract for Italy’s new Pedemontana Lombarda highway is likely to be handled by a consortium headed by Austrian contractor Strabag. The agreement will be finalised in September 2011. The consortium has a provisional deal for design and construction of the €2.3 billion 75km highway, which will connect Bergamo to Milan Malpensa airport, bypassing Milan. The consortium also includes Adanti, Grandi Lavori and Impresa Costruzioni Giuseppe Maltauro. The Pedemontana Lombarda highway project features a 65km st
May 9, 2012 Read time: 2 mins
RSSThe contract for Italy’s new Pedemontana Lombarda highway is likely to be handled by a consortium headed by Austrian contractor 945 Strabag. The agreement will be finalised in September 2011. The consortium has a provisional deal for design and construction of the €2.3 billion 75km highway, which will connect Bergamo to Milan Malpensa airport, bypassing Milan. The consortium also includes Adanti, 3869 Grandi Lavori Fincosit and 3873 Impresa Costruzioni Giuseppe Maltauro. The Pedemontana Lombarda highway project features a 65km stretch of highway extending from the Cassano Magnago autostrada (the A8) to the Osio Sotto autostrada (the A4) and includes a bypass of Como and Varese. The project also includes a 20km stretch of suburban main road, plus a series of road works that will link the new route with the local traffic network. Completion was originally planned for 2012 and the route is expected to handle 65,000 cars/day, while the total cost will be €4.3 billion including all the secondary links and additional work.

For more information on companies in this article

Related Content

  • Polish highway deals
    March 2, 2012
    Tenders are being evaluated for a 37km section of the S3 dual carriageway between Gorzow Wielkopolski and Miedzyrzecz in Poland.
  • Key highway project for Norway
    January 9, 2014
    The Norwegian Public Roads Administration, Statens Vegvesen , has awarded contracts for the E6 highway to Implenia and KA Austad and for the E18 south of capital Oslo. The E6 contract relates to the stretch connecting Vinstra and Sjoa in Gudbrandsdalen and is worth some €185.71 million. The construction work is now commencing and will take until October 2016 to complete. The project is for 16km of the E6 however it will include tunnel construction work. Hard, competent rock conditions mean that drill and bl
  • Nigeria’s new US$2 billion coastal highway
    April 25, 2024
    Nigeria is planning a US$2 billion coastal highway.
  • Texas highway widening project
    May 9, 2022
    A major Texas highway widening project is planned.