Skip to main content

Concrete Solution for Vietnam

Transportation project development in Vietnam will be using cement instead of asphalt. A plan for the switch to cement through 2020 will be drafted by the Department of Planning and Investment. The plan will have a vision through 2020. A deal to support such switch has been entered by the Ministries of Construction and Transport. A pilot for the cement usage will take place with the development of a road stretching 25 km to link Cau Gie-Ninh Binh and Hanoi-Haiphong expressways. Longevity of the roads will b
May 2, 2012 Read time: 1 min
Transportation project development in Vietnam will be using cement instead of asphalt. A plan for the switch to cement through 2020 will be drafted by the 2502 Ministry of Planning and Investment. The plan will have a vision through 2020. A deal to support such switch has been entered by the Ministries of Construction and Transport. A pilot for the cement usage will take place with the development of a road stretching 25 km to link Cau Gie-Ninh Binh and Hanoi-Haiphong expressways. Longevity of the roads will be higher when cement is used instead of asphalt.

For more information on companies in this article

Related Content

  • Quang Ninh agrees to SE's new draft for Bach Dang Bridge in Vietnam
    October 18, 2012
    Vietnam's Quang Ninh province has backed a new design proposed by Japanese developer SE Group for the 4.3km Bach Dang Bridge. The new design will change the original prestressed concrete bridge design to a steel cable-stayed bridge. The modification will lower the girder height, reduce the bridge length and alter the main span length. The altered draft is awaiting final approval from the authorities. SE Group has also requested to cut the expenses for the project to US $ 386 million from $ 483 million. The
  • Vietnam’s new highway connection project moving forward
    October 10, 2017
    Vietnam is planning to construct a new expressway in Hoa Binh and Son La provinces in the north of the country. The project is expected to cost US$2.21 billion and will be carried out in two stages under the PPP model. The route runs of 189.5km, with an 85.4km stretch from Hoa Binh to Moc Chau due for completion in 2020. A further 104.1km section will be built later.
  • Vietnam's new highway projects
    February 24, 2012
    Key highway projects are being planned in Vietnam. The Ninh Binh-Thanh Hoa expressway will run 127km and is expected to cost US$1.6 billion to construct. The Nghi Son-Bai Vot expressway will cost $1 billion to build and Vietnam's Ministry of Transport (MoT) hopes to source a loan from the World Bank for this project. Vietnam's MoT is putting the projects through the tender process at present. The deals will be made under either the build-operate-transfer (BOT) or public-private partnership (PPP) models. So
  • Highway proposals to extend Vietnam’s network
    November 12, 2015
    A series of major highway and road projects have been proposed for Vietnam. Investors have submitted a proposal to build North-South road costing an estimated US$383.8 million. Another proposal has come from the Project Management Board 85 to develop Bien Hoa-Tan Thanh-Cai Mep Seaport expressway, with an estimated cost of $591.5 million.