Skip to main content

Concrete Solution for Vietnam

Transportation project development in Vietnam will be using cement instead of asphalt. A plan for the switch to cement through 2020 will be drafted by the Department of Planning and Investment. The plan will have a vision through 2020. A deal to support such switch has been entered by the Ministries of Construction and Transport. A pilot for the cement usage will take place with the development of a road stretching 25 km to link Cau Gie-Ninh Binh and Hanoi-Haiphong expressways. Longevity of the roads will b
May 2, 2012 Read time: 1 min
Transportation project development in Vietnam will be using cement instead of asphalt. A plan for the switch to cement through 2020 will be drafted by the 2502 Ministry of Planning and Investment. The plan will have a vision through 2020. A deal to support such switch has been entered by the Ministries of Construction and Transport. A pilot for the cement usage will take place with the development of a road stretching 25 km to link Cau Gie-Ninh Binh and Hanoi-Haiphong expressways. Longevity of the roads will be higher when cement is used instead of asphalt.

For more information on companies in this article

Related Content

  • Elevated highway in Vietnam starting construction
    December 12, 2016
    Construction work on a new elevated highway route through Vietnamese conurbation Ho Chi Minh City is commencing. The project involves building a 30.4km stretch of highway, Elevated Road No5, through the busy metropolis and is expected to cost US$785.25 million. The new four lane road will run above National Highway 1A, with the work forming part of a wider project intended to help reduce Ho Chi Minh City’s chronic congestion problems. In all the city’s road transport department plans to construct five of th
  • Vietnam expressway deal moving forward
    January 16, 2019
    A pre-feasibility study is being planned for Vietnam’s Hoa Binh-Moc Chau Expressway project. Construction of the expressway is expected to cost US$857.4 million, with the work being handled under the PPP model. The 85km is planned to feature two lanes in either direction. Construction of the expressway is expected to reduce journey times between Hanoi and Son La, close to the border with Laos, from six hours at present, to just 2.5 hours in the future.
  • Vietnam sets highway plan in action
    February 16, 2012
    Road upgrades and improvements are crucial to improve infrastructure in Vietnam, according to the country's Directorate for Roads.
  • Vietnam’s US$1.4 billion expressways for Cao Bang to Lang Son and Hoa Binh
    January 23, 2024
    Vietnam’s US$1.4 billion expressways to connect Cao Bang to Lang Son and transforming Hoa Binh.