Skip to main content

Composite bridge awards

The American Composites Manufacturers Association (ACMA) has announced its Awards for composites excellence (ACE) at the COMPOSITES 2010 event. The awards were presented in a number of categories, with two awards gone to composite bridge structures.
February 8, 2012 Read time: 2 mins
The 1505 American Composites Manufacturers Association (ACMA) has announced its Awards for composites excellence (ACE) at the COMPOSITES 2010 event. The awards were presented in a number of categories, with two awards gone to composite bridge structures. The most creative application award was presented to AEWC Advanced Structures & Composites Center, 1507 University of Maine, Orono, Maine, for its Bridge-in-a-Backpack, a hybrid composite-concrete bridge combining the benefits of advanced composite materials and concrete. The concept offers a cost effective, long-lasting, and easy-to-erect bridge technology. This lightweight, corrosion resistant system for short-to-medium-span bridge construction uses FRP composite arch tubes that act as a stay-in-place form, structural reinforcement, and environmental protection for concrete fill. The lightweight arches can be placed quickly by hand. The infinite possibility award was presented to 1509 Harbor Technologies, Brunswick, Maine, for its hybrid composite beam (HCB), a new structural member developed for use as a girder in bridges and other structures. This is comprised of a shell, compression reinforcement and tension reinforcement. The shell consists of a fibre reinforced polymer box beam. The compression reinforcement consists of concrete, pumped into a profiled conduit (generally an arch) within the beam shell, while carbon, glass or steel fibres anchored at the ends of the compression reinforcement provide the tension reinforcement. The HCB combines the strength and stiffness of concrete and steel with the lightweight and corrosion advantages of composite materials.

Related Content

  • Bridge drainage solution prevents water damage
    February 10, 2012
    Pipeline & Drainage Systems (PDS), is pointing to its EnviroDeck drainage product saying that unless properly drained, water can cause severe damage to bridges, particularly on deck surfaces where it may become trapped.
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • CET opens new laboratory to service UK’s infrastructure projects
    October 23, 2017
    With over £300 billion of investment in infrastructure planned over the next four years in the UK, materials testing firm CET is gearing up to service a lot more projects – Kristina Smith visited the newest laboratory near Heathrow to find out more. The CET Group has ambitious plans. Over the next four years it wants to double the size of its business, which in the last year turned over £27 million. “There’s a lot of positivity out there,” said Gary Corrigan, managing director of the group’s infrastructu
  • Float positioning for Bandra Worli Bridges
    May 29, 2024
    In Mumbai, India, two steel bridges have been barged to site and then lifted into position as part of the Mumbai Coastal Road-Bandra Worli Sea Link project.