Skip to main content

Composite bridge awards

The American Composites Manufacturers Association (ACMA) has announced its Awards for composites excellence (ACE) at the COMPOSITES 2010 event. The awards were presented in a number of categories, with two awards gone to composite bridge structures.
February 8, 2012 Read time: 2 mins
The 1505 American Composites Manufacturers Association (ACMA) has announced its Awards for composites excellence (ACE) at the COMPOSITES 2010 event. The awards were presented in a number of categories, with two awards gone to composite bridge structures. The most creative application award was presented to AEWC Advanced Structures & Composites Center, 1507 University of Maine, Orono, Maine, for its Bridge-in-a-Backpack, a hybrid composite-concrete bridge combining the benefits of advanced composite materials and concrete. The concept offers a cost effective, long-lasting, and easy-to-erect bridge technology. This lightweight, corrosion resistant system for short-to-medium-span bridge construction uses FRP composite arch tubes that act as a stay-in-place form, structural reinforcement, and environmental protection for concrete fill. The lightweight arches can be placed quickly by hand. The infinite possibility award was presented to 1509 Harbor Technologies, Brunswick, Maine, for its hybrid composite beam (HCB), a new structural member developed for use as a girder in bridges and other structures. This is comprised of a shell, compression reinforcement and tension reinforcement. The shell consists of a fibre reinforced polymer box beam. The compression reinforcement consists of concrete, pumped into a profiled conduit (generally an arch) within the beam shell, while carbon, glass or steel fibres anchored at the ends of the compression reinforcement provide the tension reinforcement. The HCB combines the strength and stiffness of concrete and steel with the lightweight and corrosion advantages of composite materials.

Related Content

  • ABM expands range of its pre-stressed concrete bridge beams
    July 7, 2016
    ABM reports that investment manufacturing equipment at its UK factory in Nottinghamshire is permitting production of an increased range of larger, heavier bridge components The new facility means that the company can now also manufacture U and W section prestressed concrete bridge beams of up to 120 tonnes. The company said that the additional capability means it can offer customers shorter cycle times, even for the heaviest and most complex beams, and a product of high and consistent quality. The dev
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • bauma innovation awards shortlist lines up 15 potential winners
    January 6, 2017
    bauma has announced the shortlist for its Innovation Awards 2013, which will be presented at the show in mid April. Speaking at the event’s giant media dialog in Munich at the end of January 29, Johann Sailer, President of the VDMA Construction Machinery and Building Materials Machinery Association revealed that the organisers had received 156 entries across the scheme’s five main categories.
  • bauma innovation awards shortlist lines up 15 potential winners
    February 19, 2013
    bauma has announced the shortlist for its Innovation Awards 2013, which will be presented at the show in mid April. Speaking at the event’s giant media dialog in Munich at the end of January 29, Johann Sailer, President of the VDMA Construction Machinery and Building Materials Machinery Association revealed that the organisers had received 156 entries across the scheme’s five main categories.