Skip to main content

Colombia's road plans

The Colombian authorities have launched 17 road infrastructure tenders worth a total of US$1.89 billion. The tender process is remaining open until 30th January 2012.
March 22, 2012 Read time: 1 min
The Colombian authorities have launched 17 road infrastructure tenders worth a total of US$1.89 billion. The tender process is remaining open until 30th January 2012. A further tender for maintenance to 20 roads will be launched in February 2012, with plans also in hand for repairs to 2,500km of roads affected by harsh winter conditions. Funds will be made available during 2012 for the most vulnerable sections of road. This is the highest level of investment ever made for Colombian road infrastructure. The 2556 Ministry of Transport has said that it will only pay for each project once the work has been completed. In addition, projects may not necessarily be awarded for the lowest bid.

For more information on companies in this article

Related Content

  • Major Central American infrastructure projects
    February 23, 2012
    Mexico and Central America are home to some of the world's most spectacular infrastructure projects as Patrick Smith reports
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Interest strong in Brazilian bridge tender
    February 10, 2015
    Interest is strong in the tender for Brazil’s proposed Rio-Niteroi bridge project. So far three groups have expressed an interest in tendering for the project, EcoRodovias, Arteris, and current contract holder CCR. The tender will commence on March 18th 2015. A number of other groups had shown interest but will duck out due to legal issues relating to the Lava-Jato case that is ongoing at present. Brazil’s national land transport agency ANTT has set a maximum tariff value for the bridge toll at US$1.89 (BRL