Skip to main content

Colombian highway project open to tenders

A major highway project for Colombia has now been opened to tenders. The project is for the Autopistas de la Prosperidad highway and the first five sections of this link have been opened to tender. Only 10 construction firms are being selected to send final bids, while the contracts will be awarded in November 2013. The five sections of the project are expected to cost a total of US$3.52 billion to construct. Overall, all nine sections of Autopista de la Prosperidad will cost $7.15 billion to build. The fou
April 12, 2013 Read time: 1 min
A major highway project for Colombia has now been opened to tenders. The project is for the Autopistas de la Prosperidad highway and the first five sections of this link have been opened to tender. Only 10 construction firms are being selected to send final bids, while the contracts will be awarded in November 2013. The five sections of the project are expected to cost a total of US$3.52 billion to construct. Overall, all nine sections of Autopista de la Prosperidad will cost $7.15 billion to build. The four remaining sections will open for tender in September 2013.

Related Content

  • Zimbabwe highway project faces delay
    July 12, 2018
    The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig
  • US$3.6 billion Colombia 5G highway project
    September 19, 2024
    Work starts on US$3.6 billion Colombia 5G highway project
  • Poland highway tender process opening
    January 3, 2017
    The tender process is opening in Poland for a stretch of highway connecting Napierki with Mlawa. This 14km stretch of the S7 dual carriageway is the first of four sections of the route to be offered for tender. The bidding process for the project is being managed by the Polish General Directorate for National Roads and Motorways (GDDKiA). Bids have to be received by the 21st February 2017, with 18 firms having been invited to tender for the work. The total value of the work to construct the four sections of
  • Tender call for US$940mn phase I of Chile’s Américo Vespucio Oriente highway
    August 1, 2013
    A tender call for the first, US$940 million stretch of the Américo Vespucio Oriente underground expressway (AVO) in Chile’s capital Santiago Chile's has been issued by the public works ministry (MOP). The prized 40-year concession entails building and operating a 9.3km underground expressway running from El Salto avenue to Príncipe de Gales avenue. The tunnel will stretch over two different levels, each one hosting a one-way, three-lane expressway. Road capacity along the route will increase to 8,000 vehicl