Skip to main content

Cofferdams completed for Sunderland city’s New Wear River Crossing

In the UK, foundation work for Sunderland city’s new bridge is about to start as the huge cofferdam in the middle of the River Wear nears completion. Water has been drained out of the cofferdam, a large steel watertight structure within the river, to allow the building of pylons for the bridge deck. It is the first bridge to be built over the Wear in Sunderland for more than 40 years and is part of the wider strategic transport plan to link the Port of Sunderland and city centre with the A19 road.
May 25, 2016 Read time: 2 mins
Cofferdam construction to allow work on main pylon foundations
In the UK, foundation work for Sunderland city’s new bridge is about to start as the huge cofferdam in the middle of the River Wear nears completion.

Water has been drained out of the cofferdam, a large steel watertight structure within the river, to allow the building of pylons for the bridge deck.

It is the first bridge to be built over the Wear in Sunderland for more than 40 years and is part of the wider strategic transport plan to link the Port of Sunderland and city centre with the A19 road.

Before the end of the year, a 105m A-frame pylon will be floated from Belgium on a giant barge before being slowly hoisted into position on the river. It will take several hours to raise the pylon and secure it.

Stephen McCaffrey, project director for FVB joint venture, created by 1622 Farrans Construction and Victor Buyck Steel Construction, said the positioning of the pylon will be “a very complex project” and “not straightforward”.

Farrans Construction is a building and civil engineering contractor across the UK and Ireland. Victor Buyck is based in Belgium and specialises in major structural steelwork, especially steel bridges. The FVB joint venture is supported by their design team led by Buro Happold Engineering and Roughan & O'Donovan.

Sunderland City Council is holding a two-phase consultation to find a name for the new bridge.

For more information on companies in this article

Related Content

  • Oklahoma DOT nearly doubles road salt storage capacity
    January 21, 2013
    The Tulsa Port of Catoosa has opened a new bulk salt storage facility for the Oklahoma Department of Transportation (ODOT) in the United States. Erected by Legacy Building Solutions, the massive tension fabric structure provides 45,359tonnes (50,000tons) of storage capacity for roadway deicing salt, nearly doubling ODOT’s available storage across the state. “ODOT will distribute the salt stored at this new location to maintenance distribution sheds ahead of impending snow or ice events during the winter,” s
  • Spencer Group cable access for Pattullo Bridge
    July 3, 2023
    Spencer is working on behalf of Fraser Crossing Constructors GP - a joint venture between Acciona and Aecon - on the suspension bridge near Vancouver, Canada.
  • Serbia completes Ostružnica Bridge
    June 25, 2020
    The 2km long bridge is the largest of all the Belgrade bypass bridges.
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642