Skip to main content

CNH head on role in new business model and “three-speed recovery” of EMEA markets

Mario Gasparri, head of the CNH Construction Equipment business for its new Europe, Middle East, Africa (EMEA) business region, outlines his and the Group’s immediate and long-term priorities “The creation of Fiat Industrial by bringing together the three businesses of CNH, Iveco and FPT Industrial has resulted in a business operating on a vast scale: Fiat Industrial is one of the top three global groups in the capital goods industry.
February 26, 2013 Read time: 1 min
Mario Gasparri has spoken about his new role at CNH Construction Equipment and the Group’s key priorities

 

%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 11560 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkInternal">View more videos</span></span> Video false /event-news/bauma-2013/video/ true false%>

Related Content

  • Terex launches Superlift 3800 crawler crane
    April 18, 2013
    Terex Cranes has replaced its CC2800-1 crawler crane with the Superlift 3800 lattice boom, offering improved speed and efficiency for customers. The 3800 can handle loads of up to 650tonnes at a radius of 5-12m and has a maximum load moment of 8,426t/m. Terex says that customers have been involved in the new crane’s development from the start, resulting in improvements in many areas. The crane uses the Terex Crane Fall Protection System, with additional railings installed around the superstructure. It is th
  • Sandvik upgrades cone crusher offering
    April 15, 2013
    Sandvik claims that its 18.9tonne CH550 cone crusher offers customers good material shape and low operating costs in a range of material applications. A development of the company’s Hydrocone design, the CH550 can be configured for either secondary or tertiary crushing applications with a wide performance range.
  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als