Skip to main content

Close call for operator in demolition accident

The crawler excavator operator in this incident had a close call when the bridge being demolished collapsed unexpectedly. The accident happened in Norway during the demolition of an old highway bridge.
June 18, 2013 Read time: 1 min
The crawler excavator operator in this incident had a close call when the bridge being demolished collapsed unexpectedly. The accident happened in Belgium during the demolition of an old highway bridge.

Related Content

  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • VIDEO: UK overnight bridge demolition job
    May 16, 2016
    A spectacular video shows footage a key bridge demolition job in the UK. The bridge crossing the busy A38 near Plymouth was demolished during a weekend possession on the 14th and 15th of May 2016. The footage has been released by 8100 Highways England and shows the old Merafield Bridge at Plympton being demolished overnight on Saturday 14th May, marking the final stage of a £6.3 million maintenance project on the A38.
  • Epic demolition work for Epiroc in Germany
    November 30, 2023
    A demolition firm in Germany has made good use of hydraulic breakers from Epiroc.
  • Flyover replacement
    February 22, 2012
    French contractor DSD Démolition was one of three firms that worked on the recent demolition of the A55 highway flyover in Marseilles, France. The 20-year-old flyover stood near the harbour and formed part of a main route through Marseille leading to Lyon and Avignon. However, it was an ugly structure and spoiled the city's landscape so as part of the wider regeneration taking part in Marseille's harbour, the 1.3km bridge had to be demolished within three months. DSD Démolition had two operators for each of