Skip to main content

A Chinese loan will help develop Macedonia’s roads

A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road. Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects
December 4, 2012 Read time: 2 mins
Route 7 in Kosovo is one of several important new highway links helping to improve connections in the Balkan region
A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road.

Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects are expected to begin in the first half of 2013. Macedonia began the construction of the last 28km stretch of the Corridor 10 highway in early 2012, with this work having a pricetag of around €300 million. The majority of the funding for Macedonia’s section of Corridor 10 highway came from the 1166 European Bank for Reconstruction and Development as well as the 1054 European Investment Bank.

Meanwhile neighbouring Kosovo’s Route 7 highway links its capital Pristina with the Albanian border. Work on Route 6 in Kosovo will commence in 2013 and this will connect Pristina to Macedonia. And talks have also been held between the Kosovan and Serbian Governments about a new highway connecting their respective capitals. This would extend Route 7 from Pristina to the border with Serbia and the talks are extremely significant given the troubled recent history between the two nations.

Read more on the Kosovo highway here:
%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2425 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkExternal">Kosovo's award-winning green highway construction</span></span> Kosovo's award-winning green highway construction false /sections/key-projects/features/kosovos-award-winning-green-highway-construction/ true false%>

For more information on companies in this article

Related Content

  • Liebherr’s HS8300HD crawler uses hybrid drive to reduce fuel consumption
    February 7, 2013
    Liebherr has developed a hybrid drive system for its HS8300HD heavy duty cycle crawler crane. The 350 tonne machine generates electrical power from its hydraulic free-fall winches, which offer up to 50 tonnes of line pull. Under this Pactronic system surplus energy is stored in a hydraulic accumulator and regenerated to assist the engine, reducing fuel consumption. This reuse of energy also cuts emissions from the machine.
  • Bar is high on Simpedil’s machine quality
    January 6, 2017
    Simpedil specialises in manufacturing bar cutting and bending machines for the concrete reinforcement industry. The firm’s 30 years plus experience and continuous machine development ensures high quality machines at all times. Simpedil also emphasises the company’s attention to pre and after sale support and its quality-price ratio. All Simpedil machines are also said to guarantee maximum efficiency and safety.
  • Bar is high on Simpedil’s machine quality
    April 9, 2013
    Simpedil specialises in manufacturing bar cutting and bending machines for the concrete reinforcement industry. The firm’s 30 years plus experience and continuous machine development ensures high quality machines at all times. Simpedil also emphasises the company’s attention to pre and after sale support and its quality-price ratio. All Simpedil machines are also said to guarantee maximum efficiency and safety.
  • Herrenkencht has developed a novel pipeline installation package
    January 6, 2017
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the