Skip to main content

A Chinese loan will help develop Macedonia’s roads

A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road. Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects
December 4, 2012 Read time: 2 mins
Route 7 in Kosovo is one of several important new highway links helping to improve connections in the Balkan region
A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road.

Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects are expected to begin in the first half of 2013. Macedonia began the construction of the last 28km stretch of the Corridor 10 highway in early 2012, with this work having a pricetag of around €300 million. The majority of the funding for Macedonia’s section of Corridor 10 highway came from the 1166 European Bank for Reconstruction and Development as well as the 1054 European Investment Bank.

Meanwhile neighbouring Kosovo’s Route 7 highway links its capital Pristina with the Albanian border. Work on Route 6 in Kosovo will commence in 2013 and this will connect Pristina to Macedonia. And talks have also been held between the Kosovan and Serbian Governments about a new highway connecting their respective capitals. This would extend Route 7 from Pristina to the border with Serbia and the talks are extremely significant given the troubled recent history between the two nations.

Read more on the Kosovo highway here:
%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2425 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkExternal">Kosovo's award-winning green highway construction</span></span> Kosovo's award-winning green highway construction false /sections/key-projects/features/kosovos-award-winning-green-highway-construction/ true false%>

For more information on companies in this article

Related Content

  • Rapid International unveils new-look corporate logo
    April 5, 2013
    Rapid International is officially uneviling its new look corporate branding at bauma. An important step forward, the company says the new logo refines and modernises the existing logo mark, and reflects both the history and the future of the company at a symbolic time for the organisation, as it welcomes the arrival of the next generation. John Pickering, son of Rapid's late founding partner Mr Bertie Pickering, joined the company recently as export sales manager.
  • Piusi’s high performance refuelling solutions
    January 6, 2017
    Piusi has 60 years of experience of manufacturing easy-to-use, high-performance solutions for transferring, dispensing and measuring fuels, lubricants and liquids. The firm says its pumps, flow meters, dispensing instruments and accessories, such as filters and nozzles, are made with pride and offer high performance, reliability and ease of use.
  • Piusi’s high performance refuelling solutions
    April 8, 2013
    Piusi has 60 years of experience of manufacturing easy-to-use, high-performance solutions for transferring, dispensing and measuring fuels, lubricants and liquids. The firm says its pumps, flow meters, dispensing instruments and accessories, such as filters and nozzles, are made with pride and offer high performance, reliability and ease of use.
  • Saltec brand Torgar is offering innovative access solutions
    January 6, 2017
    New access solutions have been developed for the TORGAR range by Spanish specialist Saltec. The new compact PT-02 industrial lift has been developed to meet the needs of the tower crane sector, for high mast applications. Meanwhile the new PL-20 is a platform type access machine that offers a 2tonne payload. The PW-6/12 work platform is the firm’s light and robust access machine that is specially designed for renovation jobs, but with a maximum platform length of 24.6m, platform width of 0.7m and maximum (s