Skip to main content

A Chinese loan will help develop Macedonia’s roads

A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road. Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects
December 4, 2012 Read time: 2 mins
Route 7 in Kosovo is one of several important new highway links helping to improve connections in the Balkan region
A loan from China will provide a crucial portion of the funding being used by the Macedonian Government to build new highway sections. These highway stretches include key links between from Stip and the existing pan-European, Corridor 10. Once complete the new highway sections will connect Macedonia with Greece and Serbia by road.

Other highway sections planned will run from Ohrid to Kicevo and form a portion of the unfinished Corridor 8 intended to connect Macedonia with Albania and Bulgaria. The projects are expected to begin in the first half of 2013. Macedonia began the construction of the last 28km stretch of the Corridor 10 highway in early 2012, with this work having a pricetag of around €300 million. The majority of the funding for Macedonia’s section of Corridor 10 highway came from the 1166 European Bank for Reconstruction and Development as well as the 1054 European Investment Bank.

Meanwhile neighbouring Kosovo’s Route 7 highway links its capital Pristina with the Albanian border. Work on Route 6 in Kosovo will commence in 2013 and this will connect Pristina to Macedonia. And talks have also been held between the Kosovan and Serbian Governments about a new highway connecting their respective capitals. This would extend Route 7 from Pristina to the border with Serbia and the talks are extremely significant given the troubled recent history between the two nations.

Read more on the Kosovo highway here:
%$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2425 0 oLinkInternal <span class="oLinkInternal"><span class="oLinkExternal">Kosovo's award-winning green highway construction</span></span> Kosovo's award-winning green highway construction false /sections/key-projects/features/kosovos-award-winning-green-highway-construction/ true false%>

For more information on companies in this article

Related Content

  • IronPlanet’s online marketplace for used construction equipment
    April 19, 2013
    IronPlanet, a leading online auction marketplace for used construction and agricultural equipment, says it is getting close to one million registered users. The company currently has 915,000 registered users – with another 4,000-a-month said to be signing up for access to its regular online auctions.
  • Euroswitch sensor achievement
    January 6, 2017
    Euroswitch is among those leading the way in the design and manufacture of level, pressure, temperature, speed and position sensors. The company says its mission is to develop high quality standard products and custom solutions supported by an efficient and flexible organisation with a highly skilled workforce.
  • Euroswitch sensor achievement
    April 5, 2013
    Euroswitch is among those leading the way in the design and manufacture of level, pressure, temperature, speed and position sensors. The company says its mission is to develop high quality standard products and custom solutions supported by an efficient and flexible organisation with a highly skilled workforce.
  • INTERMAT launch for tracked pump
    January 6, 2017
    The BSC 1409 D from Putzmeister is a self-propelled concrete pump designed specifically for concreting drilled piles on unfinished surfaces. In contrast to using truck-mounted concrete pumps for concreting drilled piles, it does not need supports to be set up each time it changes location. Compared to concreting with a delivery pipe, placement speed with the tracked concrete pump is now said to be considerably higher.