Skip to main content

Chilean bridge project to Chiloe Island delayed

Delays to the project to construct Chile’s Chacao Bridge mean that an additional two years may be required for the work. The work is now being carried out solely by a consortium, Consorcio Puente Chacao, headed by the South Korean contractor Hyundai.
October 31, 2018 Read time: 2 mins

Delays to the project to construct Chile’s Chacao Bridge mean that an additional two years may be required for the work. The work is now being carried out solely by a consortium, Consorcio Puente Chacao, headed by the South Korean contractor 236 Hyundai. The consortium asked for an extra US$200 million to carry out the project, in addition to extending the work by two years. The bridge was originally planned to be complete by 2020 but the various delays so far mean that it will not now be ready for traffic until 2023. The extra costs mean that the final bill for the project could be $900 million. 

A suspension bridge design was selected  for the link as it was thought to be best able to cope with the extremes of weather, as well as the massive earthquakes that can occur in the area. At 2.75km long, this will be South America’s longest suspension bridge once complete, with main spans of 1,055 and 1,155m. According to Hyundai, progress is being achieved on the project and the design for the south pillar is now complete.

Once the bridge is complete it will help to redevelop the economy of Chiloe Island. At present the inhabitants rely on a ferry service however the new bridge will speed transport and reduce journey times, boosting the economy and also helping to develop tourism. 

The bridge has been discussed for some years. An earlier plan for the project was cancelled over concerns about its costs. However the current project was commissioned as the suspension bridge configuration offered considerable cost benefits over the previous design, while delivering the expected connectivity to the island.
 

For more information on companies in this article

Related Content

  • Kenya highway work awarded
    October 13, 2020
    An important highway contract in Kenya has been awarded.
  • Fuel cell vehicle market will accelerate from 2015
    May 1, 2012
    While the market for fuel cell vehicles (FCVs) has been slower to develop than many anticipated a few years ago, major automakers including Toyota, Daimler, GM, Honda, and Hyundai have all publicly stated that fuel cells are a critical piece of a complete clean vehicle portfolio.
  • Bolivia dual carriageway project stalled
    September 12, 2016
    Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l
  • Blip in road safety for Europe?
    July 11, 2023
    Is this a blip in road safety for Europe?