Skip to main content

Chilean bridge project achieves resolution

A resolution has been achieved for Chile’s Chiloe Island bridge project.
By MJ Woof February 26, 2020 Read time: 2 mins
The new bridge project will replace the existing ferry service to Chiloe Island – image courtesy © Pablo Hidalgo, Dreamstime.com

A resolution has been achieved over the important Chiloe Island bridge project in Chile. The construction project is being headed by the South Korean contractor Hyundai, which has now reached an agreement with the Chilean Government over the project.

Work was halted on the project due to a dispute over the increased cost of building the bridge. However this new agreement is being signed by both parties before being reviewed by Chile’s General Comptroller.

Hyundai has said that with its signing of the agreement, the consortium will renounce a number of rights with regard to the work. However, this move will help to resolve the issue between the consortium and the Chilean Government and mitigate losses incurred to date.

The Chacao Bridge project is important for Chile as it will provide a secure connection with Chiloe Island, helping boost the economy of the area and also develop tourism in the region as a whole. At present visitors to Chiloe Island either have to travel by air or use the ferry service. Spanning the Chacao Channel, the bridge will reduce travel times considerably.

The bridge itself is of considerable engineering merit as the location is extremely challenging. The bridge may well have to cope with potentially massive earthquake shocks. Chile’s coastal region has experienced some of the highest ever seismic forces ever recorded. As a result, the designers opted for a suspension bridge as it was considered that this would be able to flex in the event of an earthquake, unlike a more rigid cable-stayed type. The Chacao Channel also feature heavy seas at times, so the structure has been designed to cope with high winds and scour.

Related Content

  • Chile bridge project under control
    November 15, 2017
    The project to build the Chacao Bridge in Chile will now be managed fully by South Korean Contractor Hyundai. The firm formed a consortium, Consorcio Puente Chacao, with Brazilian contractor OAS to build the bridge. However OAS later hit financial issues, so Hyundai has now assumed full control of the project. The new bridge will connect the mainland with Chiloe Island and will be designed to cope with potentially extreme conditions. The area has suffered some of the most powerful earthquakes ever recorded
  • Italy's Messina Strait bridge
    March 20, 2023
    The Messina Strait Bridge project in Italy is being revived.
  • Chilean highway; design unveiled
    May 17, 2019
    The design of a stretch of Chile’s Americo Vespucio Oriente (AVO) highway has been revealed.
  • Italy’s giant Messina Strait bridge
    October 2, 2024
    Report being published for Italy’s giant Messina Strait bridge