Skip to main content

Chile authorities present US$ 740mn project for Chacao bridge

Chile public authorities have presented an amended version of the Chacao bridge project, that will link Chiloe island with the mainland. Works for the 2.6km bridge will be assigned through a public competition and will cost up to US$ 740million, over US$ 200million less that the initial project presented by Puente Chiloe. The tender will be launched by the end of 2012 and should be assigned in 2013. The project is due for completion by 2019.
May 25, 2012 Read time: 1 min
Chile public authorities have presented an amended version of the Chacao bridge project, that will link Chiloe island with the mainland.

Works for the 2.6km bridge will be assigned through a public competition and will cost up to US$ 740million, over US$ 200million less that the initial project presented by Puente Chiloe. The tender will be launched by the end of 2012 and should be assigned in 2013. The project is due for completion by 2019.

Related Content

  • Transport development for Mindanao in Philippines
    June 4, 2015
    A series of transportation projects are in hand for Mindanao in the Philippines. The Philippines' Mindanao Development Authority (MinDA) has said that the Mindanao Development Corridors' major infrastructure component will cost some US$14.02 billion in all. Of the total, some $5.6 billion will be spent on airports, seaports and roads. MinDA intends that these projects will get underway out in the next two years, with work planned for completion in five years. A new bridge has been proposed that will conne
  • Southern Germany tunnel project mooted
    March 23, 2017
    Plans have been drawn up for a new road tunnel in the German town of Oberau, located to the south of Munich in Bavaria.
  • Progress for planned Denmark-Germany immersed tunnel
    October 30, 2013
    A Danish company, Femern, is submitting documents for the Fehmarn Belt Fixed Link, an immersed tunnel that will connect Germany with Denmark. The project is expected to cost in the order of €5.5 billion to construct. An 18km immersed tunnel will link the islands of Fehmarn and Lolland. Fehmarn Island is already connected with Northern Germany’s mainland by a bridge, while Lolland is already connected by a tunnel and bridges with Zealand, a link that runs via the island of Falster
  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.