Skip to main content

Changes to bridge project reviews in US will speed repairs

According to the American Road and Transportation Builders Association (ARTBA), changes in the way the US Government reviews bridge projects could speed repairs. ARTBA has long-advocated this change, which could save US taxpayers an estimated US$78 million and reduce wait times for repair projects on more than 196,000 bridges in the country. The decision by the Advisory Council on Historic Preservation (ACHP) will allow the Federal Highway Administration (FHWA) to streamline the historic preservation proces
November 28, 2012 Read time: 2 mins
According to the American Road & Transportation Builders Association (ARTBA), changes in the way the 908 US Government reviews bridge projects could speed repairs. ARTBA has long-advocated this change, which could save US taxpayers an estimated US$78 million and reduce wait times for repair projects on more than 196,000 bridges in the country. The decision by the Advisory Council on Historic Preservation (ACHP) will allow the 2410 Federal Highway Administration (FHWA) to streamline the historic preservation process for concrete and steel bridges built after 1945. This will allow the projects to go through the regulatory review process as a group, rather than individually. ARTBA had supported this change when first proposed, noting that the approach is similar to how the agency dealt with historic preservation issues impacting rehabilitation and reconstruction of the Interstate Highway System (IHS). At that time, ARTBA similarly supported exempting large portions of the IHS from historic preservation regulations by identifying areas with historic value beforehand. ARTBA said the new review process, “…recognises while there will certainly be instances where active steps to preserve historical portions of the bridges will be necessary, the majority of bridge improvements in this class will not affect anything of historical significance.”

For more information on companies in this article

Related Content

  • Europe extends engine emissions deadline
    November 5, 2020
    The vote paves the way for the final adoption and publication in the Official Journal of the amended version of Regulation (EU) 2016/1628.
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • A-HID wins Széchenyi Chain Bridge work
    January 29, 2021
    The Hungarian capital Budapest had received four bids for the work.