Skip to main content

Changes to bridge project reviews in US will speed repairs

According to the American Road and Transportation Builders Association (ARTBA), changes in the way the US Government reviews bridge projects could speed repairs. ARTBA has long-advocated this change, which could save US taxpayers an estimated US$78 million and reduce wait times for repair projects on more than 196,000 bridges in the country. The decision by the Advisory Council on Historic Preservation (ACHP) will allow the Federal Highway Administration (FHWA) to streamline the historic preservation proces
December 13, 2012 Read time: 2 mins
According to the American Road & Transportation Builders Association (ARTBA), changes in the way the 908 US Government reviews bridge projects could speed repairs. ARTBA has long-advocated this change, which could save US taxpayers an estimated US$78 million and reduce wait times for repair projects on more than 196,000 bridges in the country. The decision by the Advisory Council on Historic Preservation (ACHP) will allow the 2410 Federal Highway Administration (FHWA) to streamline the historic preservation process for concrete and steel bridges built after 1945. This will allow the projects to go through the regulatory review process as a group, rather than individually. ARTBA had supported this change when first proposed, noting that the approach is similar to how the agency dealt with historic preservation issues impacting rehabilitation and reconstruction of the Interstate Highway System (IHS). At that time, ARTBA similarly supported exempting large portions of the IHS from historic preservation regulations by identifying areas with historic value beforehand. ARTBA said the new review process, “…recognises while there will certainly be instances where active steps to preserve historical portions of the bridges will be necessary, the majority of bridge improvements in this class will not affect anything of historical significance.”

For more information on companies in this article

Related Content

  • Bold move aids Ironton-Russell bridge works in U.S.
    January 24, 2014
    The bold decision to go against the norm and build the back spans using falsework for the Ironton-Russell replacement bridge between Parkersburg, Kentucky and Cincinnati, Ohio allowed land access to build the main span which, along with the first use in the U.S. of precast stay anchor blocks, meant the new structure could get built.
  • Top US industry figure welcomes movement on highway bill
    March 19, 2012
    A senior US construction association figure has praised congressional leaders for breaking the “logjam” over the introduction of a highway bill to generate jobs and improve transport infrastructure.
  • Improving barrier safety for motorcyclists
    February 23, 2012
    Mike Woof reports on delays to better barrier safety for Europe’s powered two wheeler riders. Safety for vulnerable road users continues to be a matter of some debate in Europe. Although powered two wheelers account for a comparatively small number of Europe’s vehicles as well as total distance travelled, they account for a disproportionately large number of accidents. Statistical data shows that by far the greatest risk to users of powered two wheelers as well as other vulnerable road users comes from driv
  • US highway rebuild uses hard-wearing asphalt
    July 18, 2012
    Guntert & Zimmerman equipment is being used to create a new hard-wearing asphalt surface on a key Interstate highway in the US state of Kansas as Mike Woof reports A busy Interstate highway in the US is now benefiting from a new, long-lasting surface. The road, Interstate 70 in Western Kansas, was in need of resurfacing. The full-depth asphalt roadway, up to 508mm thick in certain sections, had reached the end of its working life.