Skip to main content

Changes to bridge project reviews in US will speed repairs

According to the American Road and Transportation Builders Association (ARTBA), changes in the way the US Government reviews bridge projects could speed repairs. ARTBA has long-advocated this change, which could save US taxpayers an estimated US$78 million and reduce wait times for repair projects on more than 196,000 bridges in the country. The decision by the Advisory Council on Historic Preservation (ACHP) will allow the Federal Highway Administration (FHWA) to streamline the historic preservation proces
December 13, 2012 Read time: 2 mins
According to the American Road & Transportation Builders Association (ARTBA), changes in the way the 908 US Government reviews bridge projects could speed repairs. ARTBA has long-advocated this change, which could save US taxpayers an estimated US$78 million and reduce wait times for repair projects on more than 196,000 bridges in the country. The decision by the Advisory Council on Historic Preservation (ACHP) will allow the 2410 Federal Highway Administration (FHWA) to streamline the historic preservation process for concrete and steel bridges built after 1945. This will allow the projects to go through the regulatory review process as a group, rather than individually. ARTBA had supported this change when first proposed, noting that the approach is similar to how the agency dealt with historic preservation issues impacting rehabilitation and reconstruction of the Interstate Highway System (IHS). At that time, ARTBA similarly supported exempting large portions of the IHS from historic preservation regulations by identifying areas with historic value beforehand. ARTBA said the new review process, “…recognises while there will certainly be instances where active steps to preserve historical portions of the bridges will be necessary, the majority of bridge improvements in this class will not affect anything of historical significance.”

For more information on companies in this article

Related Content

  • Solving the Nation’s Roadwork Crisis with Greater Industry Collaboration
    December 31, 2024
    Nick Smee, Business Unit Director of Infrastructure at Causeway, discusses roadworks for the UK.
  • New Zealand's bridges survive earthquake
    February 7, 2012
    How is it that New Zealand's recent large and destructive earthquake did so little damage to the bridges in the quake zone? Mary Searle investigates. The magnitude 7.1 earthquake that hit the Canterbury region in New Zealand at 4.35am on Saturday, 4 September was similar in size to the quake that shook Haiti in January. However, the damage in Canterbury was minimal in comparison. A key contributor to this was New Zealand's preparedness for such an event. Positioned on a major fault line, New Zealand has ear
  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.
  • A new report from ARTBA provides a worrying analysis of US transport
    June 22, 2012
    A new report released by the American Road and Transportation Builders Association (ARTBA) shows transportation improvement programmes are struggling in over half the US states. ARTBA’s analysis of state highway and bridge contract awards value was compiled by McGraw-Hill Analytics. This report finds that even when adjusted for inflation, the value of highway and bridge work let in 28 states and the District of Columbia over the past 12 months is less than they awarded in pre-recession 2008. “That’s a major