Skip to main content

Cemex completes integration of its new global IT system

Cemex has achieved record time integration of its new global IT system based on Germany-based SAP’s business management software. The new SAP system, replacing the previous JD Edwards software platform, is said by the leading Mexican headquartered materials firm to be the best technology available to handle an “increasingly complex operating environment”. The company believe it will lead to a faster and better response to customers’ requirements and expectations.
July 12, 2012 Read time: 2 mins
3016 Cemex has achieved record time integration of its new global IT system based on Germany-based SAP’s business management software.

The new SAP system, replacing the previous JD Edwards software platform, is said by the leading Mexican headquartered materials firm to be the best technology available to handle an “increasingly complex operating environment”. 

The company believe it will lead to a faster and better response to customers’ requirements and expectations.

“This new platform provides real-time data from all critical processes and functions, helping us to integrate our core cement, ready-mix and aggregates businesses into a single solution that serves our customers with greater speed, precision, and quality” said Lorenzo H. Zambrano, chief executive of Cemex.

Fernando González, executive vice-president of Cemex finance and administration, added: “Achieving a global migration of this size in just 18 months is a significant milestone that shows our commitment to constant improvement.”

For the deployment of its new IT system Cemex was supported by Neoris, its global business and IT consulting firm, which is a SAP Global Services Partner.

For more information on companies in this article

Related Content

  • Asphalt plans silos increase efficiency, reduce waste
    April 10, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    May 8, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment.Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Asphalt plans silos increase efficiency, reduce waste
    March 21, 2012
    A Colombian contractor tackles specifications for asphalt road work with Astec equipment. Award-winning Colombian contractor MHC has upgraded its Astec Portable Double Barrel plant to handle highway and other projects. The plant, installed in Bucaramanga, equipped with two RAP [recycled asphalt pavement] bins, a Double Barrel Green System, and one New Generation silo was bought by MHC in 2009. It has now received a second silo and a truck scale extension.
  • Sophisticated paving technology from BPO
    October 24, 2019
    Advanced technology is enabling asphalt road surfaces to be laid with greater efficiency