Skip to main content

Canadian government offer up to US$535.76mn for US link bridge

National Post, 12 Jun 2012, online:- Up to US$535.76million (CAD 550mn) has been offered by the Canadian government towards the US$973.75million (CAD 1bn) construction of Detroit River International Crossing bridge between Windsor, Ontario and the US city of Detroit. The construction of the bridge is due for completion by 2016.
June 19, 2012 Read time: 1 min
National Post, 12 Jun 2012, online:-

Up to US$535.76million (CAD 550mn) has been offered by the Canadian government towards the US$973.75million (CAD 1bn) construction of Detroit River International Crossing bridge between Windsor, Ontario and the US city of Detroit. The construction of the bridge is due for completion by 2016.

Related Content

  • Fraser Crossing Partners chosen for new Pattullo Bridge in Canada
    February 25, 2020
    Fraser Crossing Partners consists of Acciona Infrastructure Canada and Aecon Constructors.
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • New bridge for Kazakhstan at Irtysh River
    February 9, 2016
    Work is underway in Kazakhstan for a new bridge that will span the Irtysuh River. The new bridge will improve the road connections between Pavlodar and Aksu. The bridge is due for completion by December 2016. The cost of the project is some US$146.74 million. The 12.5km long bridge will be the largest in Central Asia when complete.
  • New bridge link under construction in Ohio
    June 21, 2012
    Construction work is proceeding on track with the erection of a new bridge over the Ohio River in the US. Building work on this US$81 million project began in March 2012 and is expected to be completed by 2015. Brayman Construction Corporation is building the new Ironton-Russell Bridge, which will replace an existing structure spanning the Ohio River. Finley Engineering Group is providing bridge construction engineering services to Brayman Construction Corporation for the project, which will provide a link