Skip to main content

Calls for Czech Republic R7 dual carriageway project funds

Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50b
January 21, 2013 Read time: 1 min
Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50bn).

Related Content

  • Funding found for New Zealands new links
    June 18, 2015
    Funding worth US$1.54 billion is helping to finance a series of infrastructure projects in New Zealand. Some $980 million will help pay for the half-tunnelled 4.8km Waterview Connection. A further $350 million is being used for the widening of a 10km stretch from St Lukes Rd interchange to Lincoln Rd. A portion of the funding is also being used for upgrading the Maioro motorway interchange in New Windsor. The funds will also pay for the $70 million upgrade of Auckland’s Northwestern Motorway beyond Henderso
  • Slovakia continues to ponder an 8km Little Carpathian road tunnel
    February 12, 2015
    Controversy continues to swirl around Bratislava’s proposed D4 motorway bypass and what tunnel options under the Little Carpathian Mountains is the best value.
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b