Skip to main content

Calls for Czech Republic R7 dual carriageway project funds

Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50b
January 21, 2013 Read time: 1 min
Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50bn).

Related Content

  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Czech bridge facing demolition over condition concerns
    October 29, 2018
    A bridge located in Prague, capital of the Czech Republic, is facing calls for its demolition. Concern has been expressed over the condition of the Hlavka Bridge, which spans the Vltava River. The bridge carries heavy vehicle traffic as well as trams and is one of the city’s major transport arteries. It was built originally from 1909 to 1912, replacing an earlier wooden structure. It was then rebuilt so as to cope with vehicle traffic and at present carries up to 100,000 vehicles/day, making it one of the b
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.