Skip to main content

Calls for Czech Republic R7 dual carriageway project funds

Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50b
January 21, 2013 Read time: 1 min
Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50bn).

Related Content

  • Mott reasons to be cheerful PPP
    May 1, 2012
    Mott MacDonald has been appointed lenders’ technical advisor for a US$133.7million highway project in Gent, Belgium. The project is being funded through a public private partnership (PPP) by Via R4 Gent¹, a special purpose vehicle established to carry out the design, construction, financing and maintenance of the highway.
  • Hydraulic breakers key to Hyderabad road project
    April 10, 2012
    The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein
  • Hydraulic breakers key to Hyderabad road project
    May 8, 2012
    The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein
  • Cost-saving benefits of dual layer asphalt paving
    February 14, 2012
    Sophisticated dual layer paving technologies currently on the market are said to offer major advantages to road builders. Roads built using twin layer, hot on hot paving techniques can last considerably longer than those constructed using conventional methods. Contractors and clients also stand to gain from savings on materials costs, through the elimination of the need for emulsion spraying between binder and wearing courses and with the use of thin layer wearing course designs. At present two paver man