Skip to main content

Calls for Czech Republic R7 dual carriageway project funds

Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50b
January 21, 2013 Read time: 1 min
Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50bn).

Related Content

  • Slovakian highway projects delayed
    May 13, 2021
    Two Slovakian highway projects are now delayed.
  • Australian Institute of Landscape Architects (AILA) anger over East West Link
    August 6, 2013
    The Australian Institute of Landscape Architects (AILA) fear the design of the proposed multi-billion dollar East West Link highway in Melbourne will have a “substantial visual, environmental and amenity” impact on peoples quality of and the open spaces they enjoy. Kirsten Bauer, president of the AILA Victorian Chapter, has attacked the plans for the 18km tolled motorway, set to run from the western suburbs to the Eastern Freeway, after she and other Victorian AILA members had reviewed the “so called detai
  • Polish project causes further legal headaches
    February 28, 2012
    The long tale of woe concerning Poland's troubled A2 highway project looks set to continue with the latest developments in the case.
  • Balfour Beatty demolishes Scottish M8 bridge to create junction
    July 11, 2013
    Balfour Beatty has demolished a farm access bridge over the M8 motorway between junctions 4 and 5 to enable the completion of slip roads for the new Heartlands junction in West Lothian, Scotland. The demolition of Cowhill Bridge is a major milestone for Ecosse Regeneration in the construction of Junction 4a. Using ten excavators equipped with hydraulic breakers and munching attachments, the four span composite construction bridge was successfully removed during a recent 10-hour night time closure of the M8.