Skip to main content

Calls for Czech Republic R7 dual carriageway project funds

Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50b
January 21, 2013 Read time: 1 min
Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50bn).

Related Content

  • World's largest tunnel boring machine
    May 9, 2012
    Russian operator company NCC (Nevskaya Concession Company) has placed an order with German manufacturer Herrenknecht for the world's largest tunnel boring machine (TBM). The Mixshield TBM, for construction of the Orlovski Tunnel, "will surpass all previous TBMs" with a diameter of 19.25m and it is designed to construct a mega-tunnel to link both halves of the centre of Russia's second city St Petersburg under the River Neva and speed up traffic.
  • US$613 million new New Zealand road funding budget
    June 12, 2024
    New Zealand is setting a new road funding budget worth US$613 million.
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • New UK road link planned
    August 25, 2020
    A new UK road project is being planned.