Skip to main content

Calls for Czech Republic R7 dual carriageway project funds

Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50b
January 21, 2013 Read time: 1 min
Mayors of north-west Bohemia have urged the Czech Prime Minister to provide funds for the completion of the R7 dual carriageway. The project was launched in 1964 but has made slow progress. There are several completed sections while preparation of others was cancelled in 2012. At present, a 15.8km section between Chomutov and Velemysleves is being built with completion scheduled for September 2013. There are no other plans at present after the construction of this section worth US$ 234.48 million (CZK 4.50bn).

Related Content

  • Dual carriageway may be built between Gyor and Dunajska Streda
    July 3, 2017
    The Hungarian government said that it intends to build a dual carriageway to connect the city of Gyor and the Slovakian town of Dunajska Streda.
  • Construction delays affect Bosnian highway project
    May 10, 2012
    In Bosnia, delays have affected the construction work on the country’s key Corridor 5c highway project. So far 37km of the 336km Corridor 5c highway has been built, with 21km under construction and a further 43km section being cleared for work to commence. Construction work on a section of the Corridor 5c highway is set to commence by the end of September 2011. The section of highway being built is located in Ljubuska and Capljina, with work staring on the 4km Kravica-Bijaca and due for completion in 10 mon
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • JCB excavators JS220 and 370 work close to home
    May 14, 2018
    A fleet of JCB excavators is playing a major role in a road construction project only metres from the factory where they were built. Derbyshire-based earthmoving specialist JC Balls is working for a Carillion-Tarmac joint venture on the A50 Growth Corridor Project A. The contract is part of the National Infrastructure Plan and consists of constructing a grade-separated junction on the A50 dual carriageway to the west of the town of Uttoxeter. Project managed by Amey, the scheme is creating three new