Skip to main content

California clean-up causing union commotion

Roadside crews in California are up in arms over cleaning up an increasing amount of garbage – much of it unhealthy, some of it potentially lethal. US media are reporting that the International Union of Operating Engineers, which represents California state's maintenance workers, filed a grievance accusing the state of subjecting its members to hazardous conditions without proper training or equipment.
May 9, 2018 Read time: 2 mins
Roadside crews in California are up in arms over cleaning up an increasing amount of garbage – much of it unhealthy, some of it potentially lethal.


US media are reporting that the International Union of Operating Engineers, which represents California state's maintenance workers, filed a grievance accusing the state of subjecting its members to hazardous conditions without proper training or equipment.

Workers also must face hostility from residents in encampments of homeless people whom they are having to move on and clean up after.

"Their job is to maintain the highways and freeways,” Steve Crouch, a director with the union, reportedly said. “That's filling the potholes, that's doing the striping of the lines, that's doing the guardrails alone the edge, that's trimming the trees and shrubs and bushes along the highway. Their job is not to clean up homeless encampments."

He said the union believes that the state is not issuing workers with essential personal protective equipment, giving them the necessary training, necessary vaccinations and proper compensation for the dangerous hazmat duties.

Crouch commented on the nature of hazardous material, including faeces, urine, feminine products, needles and syringes. Workers also face dangerous dogs owned by encampment residents.

2451 California Department of Transportation estimated the cost of cleaning up after homeless groups was around US$10 million in 2016-17 – a third more than the previous period. Maintenance crews encountered about 7,000 homeless camps on rights of way of the state's 254 highways, according to news reports.

For more information on companies in this article

Related Content

  • Cleaner milling with BOMAG’s new Ion Dustshield system
    June 12, 2018
    BOMAG claims that its new Ion Dustshield system can help reduce dust emissions from milling operations. Jonathan Stringham is vice president of marketing at BOMAG and said, “If you look at the milling process, it’s another emitter of fine dust.” He said that while existing dust control systems remove dust from the working area around the operator, many then exhaust the dust forward of the machine away from the crew. However this new package is said to clean up the working area around the milling machine, s
  • Roo'd Awakening and BMW Drivers
    June 29, 2018
    A rider amongst a group of cyclists on a training run in Australia had a rather unpleasant experience. The man was cycling along a road with his team mates when a young kangaroo jumped out from the road side and collided with him, knocking him from his bicycle. Although he was riding at speed at the time, he was not seriously hurt and as one of his team mates filmed the incident, will have video footage to better remember the incident by. The feelings of the kangaroo over the incident were not recorded.
  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the