Skip to main content

Bulgarian plan

Greek contractor Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.
May 30, 2012 Read time: 1 min
Greek contractor 1570 Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol  and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.

For more information on companies in this article

Related Content

  • Delays on Slovakian projects
    July 9, 2012
    Work on several new highways being built in Slovakia as public-private partnerships (PPPs) will be delayed by six to 12 months. This means that the first sections of the Martin-Presov link will not open before 2011. The last section is expected to be completed in either late 2012 or early 2013.
  • Bulgaria tenders for Hemus tunnel repairs
    November 16, 2022
    Around 190km of the planned 418km of the partially built Hemus Motorway, also designated A2, are open to traffic.
  • New Danube River bridges proposed
    September 6, 2024
    Two new Danube River bridge crossings are being proposed.
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi