Skip to main content

Bulgarian highways moving ahead

Bulgaria's road system is underdeveloped and its highway network is seeing significant investment from the EU in terms of funding and expertise.
February 28, 2012 Read time: 1 min
Bulgaria's road system is underdeveloped and its highway network is seeing significant investment from the EU in terms of funding and expertise. Work on two key highway sections now looks set to move forward. One contract is for the construction of a 34km section of the Maritsa highway. This has been awarded to a consortium comprising Austrian firm Porr Technobau und Umwelt and Bulgarian company Patnostroitelna Tehnika. This consortium won the bidding process in the face of strong competition with a package worth €62.4 million. Meanwhile the tender process for a 17km section of Bulgaria's Struma highway has attracted 19 bidders. The road will connect Dupnitsa with Dolna Dikanya.

Related Content

  • Out with Russian bureaucracy, in with foreign road investment
    September 27, 2013
    Transport journalist Eugene Gerden reports on why foreign companies are likely to become keener to invest in Russia’s huge array of major road construction projects The Russian government led by president Vladimir Putin is stepping-up its efforts to get greater foreign company investment in Russian road building by creating favourable trading conditions, including the elimination of bureaucratic and administrative barriers.
  • Mexico’s new Jala-Puerto Vallarta Highway
    August 29, 2017
    Mexico’s highway infrastructure plays a key role in the country’s economy, carrying around 55% of its freight and 98% of its passenger traffic. To meet this demand, the network has 377,660km of roads in all. This is split between the 49,652km federal highway network, the 83,982km of state roads, 169.429km of rural roads and 74,596km of access roads. mHowever, although the federal road network manages to connect a large part of the country's strategic points, some stretches already present problems with satu
  • Delay for Tvrdosin-Nizna R3 section in Slovakia
    June 22, 2023
    The NDS agency has not reported by how much the contracted cost of €62 million will rise.
  • Low temperature asphalt and aggregate options’
    February 7, 2014
    At what point does ‘some technology’ become ‘enough technology’? Less than four years ago industry publications were filled with a persistent message, the reluctance of UK based contractors to adopt machine control to the same extent as near European neighbours, particularly close ones such as Ireland and Holland. However from 2009 onwards we have seen a huge shift in demand for machine control as the success of high profile road and rail jobs such as the M25 widening scheme and Airdrie – Bathgate rail