Skip to main content

Britain's M1 motorway re-opens after extensive fire

One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.
March 1, 2012 Read time: 1 min
A UK highways Agency photograph showing the metal support structure below the M1 after the fire damage. (David Townend Photography)
One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.

Construction work on the bridge support, and investigations to determine what remedial work needs to be carried out following extensive fire damage in a business under an elevated section of the motorway, are ongoing.

Two lanes in each direction have been re-opened on the motorway, which links the capital with Leeds in northern England. An 11km section of the route was closed following the fire.

Drivers are still advised to check before travelling, and consider alternative routes or means of travel to their destinations as there may still be some congestion due to the reduced capacity of the road.

Related Content

  • New ring road to solve problem of traffic jams in Ukraine capital Kiev
    May 10, 2018
    Ukraine’s capital Kiev will benefit from a new ring road – Eugene Gerden writes The government of Ukraine, together with the authorities of the Ukrainian capital Kiev, plans to invest up to US$2 billion in the building of a new ring road around the city. The new road, known as the Great Ring Road, will be around 200km long, of which 65km will be of existing roads and 148km of new roads. The ring road will connect three international transport corridors that run through the territory of Ukraine, as well
  • Effective stabilisation
    February 24, 2012
    Contractor BAM Nuttall and specialist piling sub contractor Aarsleff Piling, have been working closely to develop a cost-effective solution to a tricky piling problem. The two firms have developed an alternative and versatile technique to reduce the risk of delays installing 2,150 precast concrete piles along part of the route of an innovative guided busway in Cambridgeshire in the UK.
  • Norwegians would build new bridge and tunnel links
    June 18, 2021
    Norway’s road transport network is changing radically as the country gears up for greater EV use as well as a gradual phasing out of its traditional ferry links
  • New road links will cut congestion in St Petersburg
    June 20, 2016
    Road building will solve the problem of traffic jams in St Petersburg – Eugene Gerden writes The authorities in Russian city St Petersburg plan to solve the problem of traffic jams in the city during the next few years. The strategy is expected to be achieved through road building and the improvement of transport connections between different districts in the city. Implementation of these plans will take place as part of the decree 355 "Of the Strategy of St Petersburg Economic and Social Development