Skip to main content

Britain's M1 motorway re-opens after extensive fire

One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.
March 1, 2012 Read time: 1 min
A UK highways Agency photograph showing the metal support structure below the M1 after the fire damage. (David Townend Photography)
One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.

Construction work on the bridge support, and investigations to determine what remedial work needs to be carried out following extensive fire damage in a business under an elevated section of the motorway, are ongoing.

Two lanes in each direction have been re-opened on the motorway, which links the capital with Leeds in northern England. An 11km section of the route was closed following the fire.

Drivers are still advised to check before travelling, and consider alternative routes or means of travel to their destinations as there may still be some congestion due to the reduced capacity of the road.

Related Content

  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • Portsmouth bridge gets cash boost
    December 17, 2012
    Major improvements are planned to tackle a traffic bottleneck on the Northern Road Bridge in Portsmouth, on the English south coast, after the government pledged €13.73 million [£11 million] for the project. The Department for Transport has given final approval to the scheme which will see work on a replacement bridge over the Portsmouth to London railway line at Cosham. The original bridge was built to carry a dual carriageway road but is now too weak to do so. Traffic has been restricted to a single lane
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill