Skip to main content

Britain's M1 motorway re-opens after extensive fire

One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.
March 1, 2012 Read time: 1 min
A UK highways Agency photograph showing the metal support structure below the M1 after the fire damage. (David Townend Photography)
One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.

Construction work on the bridge support, and investigations to determine what remedial work needs to be carried out following extensive fire damage in a business under an elevated section of the motorway, are ongoing.

Two lanes in each direction have been re-opened on the motorway, which links the capital with Leeds in northern England. An 11km section of the route was closed following the fire.

Drivers are still advised to check before travelling, and consider alternative routes or means of travel to their destinations as there may still be some congestion due to the reduced capacity of the road.

Related Content

  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Chile’s growing traffic volumes are a growing problem
    May 9, 2016
    Chile’s growing traffic volumes are creating a growing problem for traffic management. In many urban areas in Chile congestion is increasing at a rapid rate. Capital Santiago is afflicted particularly badly in this respect. Traffic jams are now frequent on the main interurban routes in Chile, especially on toll roads, and the number of vehicles travelling on these roads continues to rise month after month, leading to major concern.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v