Skip to main content

Britain's M1 motorway re-opens after extensive fire

One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.
March 1, 2012 Read time: 1 min
A UK highways Agency photograph showing the metal support structure below the M1 after the fire damage. (David Townend Photography)
One of Britain's major motorways, the M1, is now able to carry traffic in both directions between junctions 1 and 4 near London, following extensive investigation, assessment, and structural reinforcement which has taken place non-stop since Friday, 15 April.

Construction work on the bridge support, and investigations to determine what remedial work needs to be carried out following extensive fire damage in a business under an elevated section of the motorway, are ongoing.

Two lanes in each direction have been re-opened on the motorway, which links the capital with Leeds in northern England. An 11km section of the route was closed following the fire.

Drivers are still advised to check before travelling, and consider alternative routes or means of travel to their destinations as there may still be some congestion due to the reduced capacity of the road.

Related Content

  • £317 million UK highway project delayed
    February 12, 2025
    A £317 million UK highway project is delayed.
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • New UK motorway link under construction
    June 18, 2015
    Construction of a new junction on the M1 near Dunstable in Bedfordshire is starting in the UK. The new junction, junction 11A, is located just to the south of Toddington services and forms part of a new €225 million link road between the A5 and the M1 that will help to unlock growth and reduce congestion in the area. Work on the link road began in March.