Skip to main content

Bridge replacement programme for Pennsylvania

A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises Gr
October 31, 2014 Read time: 1 min
A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the 2535 Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises 1007 Granite Construction, Walsh Group and 2418 HDR Engineering. Construction will commence in the summer of 2015 followed by completion within three years. Inclusive of financing costs, an average of $65million/year will be paid by the state under the contract's 28-year term for $1.82 billion in total.

For more information on companies in this article

Related Content

  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Tyne Bridge revamp finally starts
    February 12, 2024
    The UK’s Department for Transport has handed over €41 million – promised in 2022 – for a restoration of the historically listed 95-year-old Tyne Bridge in northeast England.
  • Make the case for electronic tolling, ASECAP conference delegates heard
    September 14, 2015
    Mobility pricing and electronic tolling is the future, delegates to a recent ASECAP Study Days conference, reports Geoff Hadwick at the Lisbon event. The international road tolling industry is failing to make its case and the sector is losing out to other social and political lobby groups. As a result, “tolling is still on the sidelines”, according to the head of the Washington-based International Bridge, Tunnel and Turnpike Association. IBTTA chief executive Pat Jones issued his stark warning at the