Skip to main content

Bridge replacement programme for Pennsylvania

A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises Gr
October 31, 2014 Read time: 1 min
A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the 2535 Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises 1007 Granite Construction, Walsh Group and 2418 HDR Engineering. Construction will commence in the summer of 2015 followed by completion within three years. Inclusive of financing costs, an average of $65million/year will be paid by the state under the contract's 28-year term for $1.82 billion in total.

For more information on companies in this article

Related Content

  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports
  • Signify to light up Massey Tunnel
    January 15, 2021
    The LED replacements in the Vancouver area tunnel are Lumec TunnelView, made by Signify.
  • New Chinese road projects
    August 17, 2020
    Major new Chinese road projects are being planned.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk