Skip to main content

Bridge replacement programme for Pennsylvania

A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises Gr
October 31, 2014 Read time: 1 min
A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the 2535 Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises 1007 Granite Construction, Walsh Group and 2418 HDR Engineering. Construction will commence in the summer of 2015 followed by completion within three years. Inclusive of financing costs, an average of $65million/year will be paid by the state under the contract's 28-year term for $1.82 billion in total.

For more information on companies in this article

Related Content

  • The need to repair and replace the world's bridges
    February 22, 2012
    The future of Scotland's Forth Road Bridge is posing serious questions with a wide potential impact for the transportation sector. All over the world existing highway bridges are in need of repair and replacement, with potentially catastrophic consequences should this need be ignored.
  • Success of ICOET 2011 event for sustainable roads
    February 23, 2012
    The ICOET 2011 event proved a success for sustainable transportation – *Leonard Sielecki
  • Texas road improvement works for Webber
    August 4, 2022
    Road improvement works have been awarded to Webber in Texas.
  • Success of ICOET 2011 event for sustainable roads
    April 12, 2012
    The ICOET 2011 event proved a success for sustainable transportation – *Leonard Sielecki With over 500 delegates from 21 countries, the recent 2011 International Conference on Ecology and Transportation (ICOET) held in Seattle, Washington, USA proved a success. Organised and co-sponsored by the Center for Transportation and the Environment (CTE) at North Carolina State University, and co-hosted by the Washington State Department of Transportation (WSDoT), the five-day conference ran from August 21st-25th