Skip to main content

Bridge milestones for Transylvania in Romania

The Transylvania Bridge - Romania’s longest cable-stayed bridge - and the Buzău River Bridge - the country’s longest bridge - were recently completed.
By David Arminas July 21, 2025 Read time: 3 mins
Strabag Romania completes the Transylvania Bridge in Satu Mare (image courtesy Strabag/© Mango Fresh and Creative)

Strabag Romania has completed Romania’s longest cable-stayed bridge, the 644m-long Transilvania Bridge in Satu Mare, at a cost of around €40 million.

The project marks the most significant infrastructure development in the city in more than 40 years and one of the most complex in Romania, the company said. Construction of the bridge over the Someș River began in May 2020 and features a harp-design involving two 73m-high pylons supporting 56 cables.

The structure includes four vehicle lanes, two pedestrian walkways and a cycle lane, improving access between the northern and southern districts of Satu Mare, capital city of Satu Mare County with a population of around 93,000 and broadly part of Transylvania.

“The Transylvania Bridge is more than a structure made of concrete, steel and iron; it is a new symbol of the city of Satu Mare, an engineering marvel and an economic landmark for our entire town,” said Gábor Kereskényi, mayor of Satu Mare.

The project incorporated advanced construction methodologies, including Building Information Modeling (BIM) 5D for integrated planning and execution. To ensure optimal alignment and tensioning of the stay cables, the Strabag team used drone-mounted LIDAR technology to accurately map the anchorage base plates within the bridge pylons. The resulting high-resolution data was processed over 48 hours using a high-performance server, notes the company.

The new Buzău River Bridge - second longest in Romania - will redirect traffic from the Mărăcineni bridge and the northern ring road of the city of Buzău (image courtesy Regional Directorate for Roads and Bridges Buzău)
The new Buzău River Bridge - second longest in Romania - will redirect traffic from the Mărăcineni bridge and the northern ring road of the city of Buzău (image courtesy Regional Directorate for Roads and Bridges Buzău)

”Transylvania Bridge in Satu Mare represents our long-term commitment to building future-ready infrastructure solutions for Romania,” said Herbert Schuster, Commercial Subdivision Manager at STRABAG Romania. “Working on the largest infrastructure project in Satu Mare in over 40 years is a source of pride for the Strabag team.”

Meanwhile, local authorities in Buzău County in the south-east of Romania have opened the new bridge over the Buzău River.

With a length of 1.3 km - second longest in the country - the bridge is part of Lot 1 Buzău-Vadu Pașii contract for the A7 Motorway, according to the Romanian news website Romania-Isider.com. The A7 is a strategic motorway to connect the Moldova region with the rest of the country, according to the Regional Directorate for Roads and Bridges Buzău. Cost of the 1.3km-long bridge is around €135.6 million.

The opening of the bridge will improve traffic flow, redirecting it from the Mărăcineni bridge and the northern ring road of Buzău. The city, of around 105,000 people, is a railway hub in south-eastern Romania, where railways linking Bucharest to Moldavia and Transylvania to the Black Sea coast meet.

Construction of the bridge was done by Spedition UMB, part of UMB Group, a private Romanian company owned by the Romanian entrepreneur Dorinel Umbrărescu. He also owns Banca Română de Credite și Investiții - formerly ATEbank Romania - and is commonly known as Romania's ‘asphalt king’.

For more information on companies in this article

Related Content

  • Transylvanian motorway breaks new ground in engineering
    July 11, 2012
    Normally in hilly ground, we would use the excavated soil from the cuttings to fill the valleys," says Bogdan Sgarcitu, External Affairs Manager of construction company Bechtel. "But on this stretch the clay-like soil cannot be compacted, so we've had to use many more piles than normal: in just three months we installed more than 500, some drilled as deep as 24m. We've also had to transport millions of tonnes of materials over some less-than-perfect infrastructure."
  • Bihar crossing for Ganges River
    November 16, 2016
    A loan facility from the Asian Development Bank (ADB) will help fund work on the project to construct a new bridge over the River Ganges in India’s Bihar State. Because of the width of the river at this point, the bridge will be close to 10km in length, making it the longest in India. The new bridge will improve transport connections between the north and south of the state and the project is expected to cost around US$500 million. Building the bridge will help develop transport and trade in the area, as we
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.
  • Cofferdams completed for Sunderland city’s New Wear River Crossing
    May 25, 2016
    In the UK, foundation work for Sunderland city’s new bridge is about to start as the huge cofferdam in the middle of the River Wear nears completion. Water has been drained out of the cofferdam, a large steel watertight structure within the river, to allow the building of pylons for the bridge deck. It is the first bridge to be built over the Wear in Sunderland for more than 40 years and is part of the wider strategic transport plan to link the Port of Sunderland and city centre with the A19 road.