Skip to main content

Bridge milestones for Transylvania in Romania

The Transylvania Bridge - Romania’s longest cable-stayed bridge - and the Buzău River Bridge - the country’s longest bridge - were recently completed.
By David Arminas July 21, 2025 Read time: 3 mins
Strabag Romania completes the Transylvania Bridge in Satu Mare (image courtesy Strabag/© Mango Fresh and Creative)

Strabag Romania has completed Romania’s longest cable-stayed bridge, the 644m-long Transilvania Bridge in Satu Mare, at a cost of around €40 million.

The project marks the most significant infrastructure development in the city in more than 40 years and one of the most complex in Romania, the company said. Construction of the bridge over the Someș River began in May 2020 and features a harp-design involving two 73m-high pylons supporting 56 cables.

The structure includes four vehicle lanes, two pedestrian walkways and a cycle lane, improving access between the northern and southern districts of Satu Mare, capital city of Satu Mare County with a population of around 93,000 and broadly part of Transylvania.

“The Transylvania Bridge is more than a structure made of concrete, steel and iron; it is a new symbol of the city of Satu Mare, an engineering marvel and an economic landmark for our entire town,” said Gábor Kereskényi, mayor of Satu Mare.

The project incorporated advanced construction methodologies, including Building Information Modeling (BIM) 5D for integrated planning and execution. To ensure optimal alignment and tensioning of the stay cables, the Strabag team used drone-mounted LIDAR technology to accurately map the anchorage base plates within the bridge pylons. The resulting high-resolution data was processed over 48 hours using a high-performance server, notes the company.

The new Buzău River Bridge - second longest in Romania - will redirect traffic from the Mărăcineni bridge and the northern ring road of the city of Buzău (image courtesy Regional Directorate for Roads and Bridges Buzău)
The new Buzău River Bridge - second longest in Romania - will redirect traffic from the Mărăcineni bridge and the northern ring road of the city of Buzău (image courtesy Regional Directorate for Roads and Bridges Buzău)

”Transylvania Bridge in Satu Mare represents our long-term commitment to building future-ready infrastructure solutions for Romania,” said Herbert Schuster, Commercial Subdivision Manager at STRABAG Romania. “Working on the largest infrastructure project in Satu Mare in over 40 years is a source of pride for the Strabag team.”

Meanwhile, local authorities in Buzău County in the south-east of Romania have opened the new bridge over the Buzău River.

With a length of 1.3 km - second longest in the country - the bridge is part of Lot 1 Buzău-Vadu Pașii contract for the A7 Motorway, according to the Romanian news website Romania-Isider.com. The A7 is a strategic motorway to connect the Moldova region with the rest of the country, according to the Regional Directorate for Roads and Bridges Buzău. Cost of the 1.3km-long bridge is around €135.6 million.

The opening of the bridge will improve traffic flow, redirecting it from the Mărăcineni bridge and the northern ring road of Buzău. The city, of around 105,000 people, is a railway hub in south-eastern Romania, where railways linking Bucharest to Moldavia and Transylvania to the Black Sea coast meet.

Construction of the bridge was done by Spedition UMB, part of UMB Group, a private Romanian company owned by the Romanian entrepreneur Dorinel Umbrărescu. He also owns Banca Română de Credite și Investiții - formerly ATEbank Romania - and is commonly known as Romania's ‘asphalt king’.

For more information on companies in this article

Related Content

  • ULMA bridges the Danube and Kayak rivers
    March 16, 2021
    The D4 motorway and R7 expressway project is Slovakia’s largest public-private partnership.
  • Mallatite and TRT Lighting brightens up Scotland’s Erskine Bridge
    December 15, 2017
    Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland. The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River
  • Doka’s Voest Bridge bypass project
    February 10, 2020
    The Voest Bridge over the Danube River is part of the A7 Mühlkreis Autobahn through Linz, Austria, is 40 years. Two bypass bridges are being constructed alongside the existing cable-stayed bridge as part of the client ASFINAG’s strategy to boost traffic capacity - around 100,000 vehicles cross the old bridge each day.
  • Romania to build wildlife bridges over the A1
    June 17, 2019
    Romania’s transport ministry says it plans to build animal crossings over the A1 motorway between Lugoj and Deva in the west of the country. The crossings will be over a 9km section of the A1 and cost around €180 million, said Razvan Cuc, the transport minister. nTenders will be issued for both the design and construction with work to start by the end of the summer. When completed, likely by the end of this year, the A1 will be 576km long and run across Romania in a south-east to north-west direction.