Skip to main content

Brazilian Government prepares latest motorway concession auctions

The Brazilian government is preparing the fourth stage of motorway concession auctions which include the construction of 4,000kms of roads in the South American country. A new call for tender will comprise projects in the Northern, North-Eastern, Central-Western, and South-Eastern regions of Brazil. Bids have been asked to not only refer to the overall cost of the project, but to also cover possible toll charges after its conclusion, in order to moderate the impact on agricultural haulage.
August 3, 2012 Read time: 1 min
The Brazilian government is preparing the fourth stage of motorway concession auctions which include the construction of 4,000kms of roads in the South American country.

A new call for tender will comprise projects in the Northern, North-Eastern, Central-Western, and South-Eastern regions of Brazil. Bids have been asked to not only refer to the overall cost of the project, but to also cover possible toll charges after its conclusion, in order to moderate the impact on agricultural haulage.

Related Content

  • Hyundai opens new facility in Brazil
    May 7, 2013
    Hyundai Heavy Industries has completed its first construction equipment factory in Brazil. The 562,000 m2 factory represents an investment of US$175 million and will have a production capacity of 3,000 units/year initially. It will produce excavators, wheel loaders, and backhoe loaders, and the firm also has plans to increase capacity to 4,000 units/year by 2014. This new Brazilian plant will serve as the South and Central America base helping Hyundai Heavy secure market share, and provide better service to
  • Two consortia bid for US$924.84mn Colombia highway concession
    April 17, 2014
    Two consortia have bid for Colombia's US$924.84 million (COP 1.79 trillion) Conexión Pacífico 1 highway concession, the first project under the Autopistas para la Prosperidad program and part of the country's fourth generation (4G) of concessions. There were 10 prequalified consortia and the two to submit bids were Autopista Conexión Pacífico I, comprised of local firm Estudios y Proyectos del Sol (Episol) and Spain's Iridium, and Infraestructura Vial de Colombia, comprised of Colombian firms Carlos Albe
  • The Russian government is set to revise roadbuilding standards and technologies
    May 29, 2013
    The Russian government is considering revising standards and technologies of roadbuilding in the country, writes Eugene Gerden. The aim is to accelerate implementation of one of the major public projects in the transport industry of Russia in the coming years: expansion of the road network from the current 900,000km to 1.3 million km by 2030 as part of the current Russian State Transport Strategy. According to a recent study, conducted by analysts of the Presidential Head Control Directorate, maintaining th
  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.