Skip to main content

Brazil in transport spend fast lane

The Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure. The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.
April 27, 2012 Read time: 2 mins
A JCB Loadall telescopic handler takes on concrete for the stadium refurbishment
RSSThe Brazilian Government has announced a US$17.01billion package for new mobility and public transport infrastructure.

The huge investment includes the construction of 200km of underground and light tramway lines and more than 600km of new bus lanes. The programme of works, titled 'PAC Mobilidade Urbana Grandes Cidades', is set to benefit people in 51 cities and the metropolitan areas of 18 states.

The new infrastructure, which will also create 380 new bus terminal stations and see the purchase of more than 1,000 new trains, will be part funded by the Federal state.

Also in Brazil, the Governor of São Paulo, Geraldo Alckim, says the regional road development agency 2529 Dersa, has received 25 pre-qualification bids for the tender to build six phases of the north stretch of the Brazilian city’s ring road at an estimated cost of US$3.11 billion, with the International Development Bank among the financiers.

The north stretch of the São Paulo ring road will cover 44km; will interconnect the west and east stretches, and comprises seven tunnels and 111 bridges and viaducts.

Also in Brazil, two 255 JCB customers, AMP Locações and MG Porto, have teamed up to provide five JCB machines for the redevelopment of the Governador Plácido Castelo Stadium in the city of Fortaleza, which will host six games at the Brazil 2014 World Cup in 2014. It is being expanded to a crowd capacity of 67,000.

AMP Locações and MG Porto are carrying out demolition and materials handling work on the project and JCB 3CX and JCB 4CX backhoe loaders have been equipped with hydraulic breakers to demolish the stadium’s upper cover; a 1CX backhoe loader is used to access confined spaces, and two JCB Loadall telescopic handlers are also being used.

For more information on companies in this article

Related Content

  • Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel
    August 18, 2015
    Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

    Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

    The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.
  • JCB shows LiveLink telematics at INTERMAT 2012
    January 6, 2017
    JCB will be showing its LiveLink telematics system, which is now fitted as standard on 80% of its products sold across Europe.
  • JCB shows LiveLink telematics at INTERMAT 2012
    February 3, 2012
    JCB will be showing its LiveLink telematics system, which is now fitted as standard on 80% of its products sold across Europe.
  • JCB wins US$56.8million of new orders
    July 20, 2012
    JCB has secured an order for 550 machines worth £16 million from A-Plant, one of the UK’s leading rental firms. The order is part of a phased investment programme which has seen the plant hirer buy a total of 1,089 JCB machines in the last nine months. The latest order includes more than 400 mini and midi excavators, including 50 JCB 8085 eco midi excavators, said to be 27% more productive and more than 20% more fuel efficient than the model it replaced. The deal also includes Loadall telescopic handlers